Request a SWPPP without printing a thing.

Answer what you know, photograph what you don't, and sign at the end.

Start my request Five short steps, about 10 minutes

What you'll need

  • Total and disturbed acreage — an estimate is fine
  • Whether the site is over the Edwards Aquifer, and which zone
  • Start date and how you'll stabilize
  • Your STEERS numbers, if you have them

Don't have all of it? Save your progress and finish later.

2,000+

SWPPPs prepared in Texas

2–7 days

Business days, once your invoice clears and we have your info

100%

TCEQ compliance record on our plans, as of Oct 2026

Certification

  • SBESmall Business Enterprise

WHAT HAPPENS NEXT
01 You sign and submit

It lands with our team immediately. No attachment to email, nothing to print.

02 We confirm scope and invoice

A reviewer checks your acreage and services, then sends the invoice. Drafting starts once it clears.

03 Your sealed SWPPP arrives

Emailed as a PDF, ready to print and keep on site with your permit.

STUCK ON A QUESTION?
S Call Sammie at (254) 722-2229 — our resident SWPPP advisor.

Mon–Fri, 7am–4pm CT. Or email samantha@best-texas.com.

Want to read the rules yourself? TCEQ stormwater permitting.

The TCEQ fee is not ours

If your project needs a Notice of Intent, TCEQ's $230.32 permit fee is paid by you directly in STEERS. We prepare and file the paperwork; that fee never appears on our invoice.

Prefer the old form?

The fillable PDF is still available here — but requests sent through this page skip the email back-and-forth and get started sooner.

We stay on the job through final stabilization

Your sealed SWPPP is the first step. We know Texas stormwater regulations inside and out, and here's how we can help with the rest of your project.

  • Permits

    We gather the documents and submit the paperwork, so you can stay focused on getting the project done.

  • Compliance

    We review and update your SWPPP as the job changes, make sure erosion controls go in as planned, and keep track of permits, inspections, and reports.

  • Inspections and monitoring

    Regular site inspections, plus tracking rainfall, runoff, and site changes, so we can spot problems early and adjust controls quickly.

  • Maintenance and repairs

    Even well-planned controls need upkeep. We repair damaged controls so your project keeps moving without delays.

  • Compliance mediation

    If a violation happens, we work directly with regulators to find a fast, effective fix that keeps delays, costs, and penalties to a minimum.

Common questions

Quick answers about permits, plans, and inspections.

Still not sure? Call Sammie at (254) 722-2229 (Mon–Fri, 7am–4pm CT) or email samantha@best-texas.com.

Do I need a SWPPP?

Projects that expose one acre or more of soil through grading, clearing, or grubbing need coverage under TCEQ's Construction General Permit and a Stormwater Pollution Prevention Plan (SWPPP).

  • 5 acres or more: a Notice of Intent filed with TCEQ, a Large Construction Site Notice, and a SWPPP.
  • Under 1 acre, but part of a common plan of development: a Large Construction Site Notice, a Notice of Intent filed with TCEQ, and a SWPPP.
  • 1 to under 5 acres, not part of a common plan: a Small Construction Site Notice and a SWPPP.
  • Under 1 acre, not part of a common plan: a SWPPP isn't required under TCEQ's Construction General Permit. You may still need erosion controls, and your city may have its own rules. Waco and Killeen, for example, require an erosion control plan.
What's the difference between a SWPPP and an Erosion Control Plan?

A SWPPP (Stormwater Pollution Prevention Plan) meets the state's requirements for controlling erosion, sediment, and pollutants on a construction site. An Erosion Control Plan (ECP) is a city or county plan that meets local requirements, which can go above and beyond the state's.

How quickly can I get a SWPPP completed?

Most SWPPPs are done in 2–3 business days once we have all the required information. Larger or more complex projects can take a little longer, up to 7 business days.

On a tight deadline? Call Sammie at (254) 722-2229 and we'll see what we can do.

Can I amend a SWPPP if my project's scope changes?

Yes. Reach out and we'll walk you through the amendment process.

How important are inspections?

Very. Inspection reports are legal documents, and intentionally falsifying one violates federal law and can lead to fines or imprisonment.

A good report is an honest snapshot of site conditions, good and bad. TCEQ and city enforcement officers know every site has problems and expect to see them noted.

What are the most common compliance issues?

Most SWPPP violations are investigated because of a complaint from the public. These are the issues we see most:

  • Construction exits: stabilized to keep sediment from being tracked off site.
  • Concrete washouts: properly contained to avoid contamination.
  • Perimeter controls: silt fences, wattles, and berms that are actually doing their job.
  • Inlet protection: storm drains kept free of debris.
  • Pond stabilization: retention and detention ponds protected from erosion and sediment buildup.
  • Street sweeping: roads kept clear of construction debris.
  • Permitting and posting: the required documents posted on site.

Violations stick around. TCEQ updates its Compliance History Database every September 1, based on the previous five years.